Crawler Excavator R160LC-7
|
|
FOREWORD |
SECTION 1 |
|
SAFETY
HINT |
Group 1 |
Before
operating the machine |
|
Group 2 |
During
operating the machine |
|
Group 3 |
During
maintenance |
|
Group 4 |
Parking |
|
SECTION 2 |
|
SPECIFICATIONS |
Group 1 |
Major
components |
|
Group 2 |
Specifications |
|
Group 3 |
Working
range |
|
Group 4 |
Weight |
|
Group 5 |
Lifting
capacities |
|
Group 6 |
Bucket
selection guide |
|
Group 7 |
Undercarriage |
|
Group 8 |
Specification
for major components |
|
Group 9 |
Recommended
oils |
|
SECTION 3 |
|
CONTROL
DEVICE |
Group 1 |
Cab
device |
|
Group 2 |
Cluster |
|
Group 3 |
Switches |
|
Group 4 |
Levers
and pedals |
|
Group 5 |
Air
conditioner and heater |
|
Group 6 |
Others |
|
SECTION
4 |
|
OPERATION |
Group 1 |
Suggestion
for new machine |
|
Group 2 |
Check
before starting the engine |
|
Group 3 |
Starting
and stop the engine |
|
Group 4 |
Mode
selection system |
|
Group 5 |
Operation
of the working device |
|
Group 6 |
Traveling
of the machine |
|
Group 7 |
Efficient
working method |
|
Group 8 |
Operation
in the special work sites |
|
Group 9 |
Normal
operation of excavator |
|
Group 10 |
Attachment
lowering Pattern |
|
Group 11 |
Storage |
|
Group 12 |
RCV
lever operating pattern |
|
Group 13 |
Switching
Hydraulic attachment circuit |
|
SECTION 5 |
|
TRANSPORTATION |
Group 1 |
Preparation
for transportation |
|
Group 2 |
Dimension
and weight |
|
Group 3 |
Loading
the machine |
|
Group 4 |
Fixing
the machine |
|
Group 5 |
Loading
and unloading by crane |
|
SECTION 6 |
|
MAINTENANCE |
Group 1 |
Instructions |
|
Group 2 |
Tightening
torque |
|
Group 3 |
Specification
of fuel, coolant and lubricants |
|
Group 4 |
Maintenance
check list |
|
Group 5 |
Maintenance
chart |
|
Group 6 |
Service
instruction |
|
Group 7 |
Electrical
system |
|
Group 8 |
Air
conditioner and heater |
|
SECTION 7 |
|
TROUBLESHOOTING
GUIDE |
Group 1 |
Engine |
|
Group 2 |
Electrical
system |
|
Group 3 |
Others |
|
SECTION 8 |
|
HYDRAULIC
BREAKER |
Group 1 |
Selecting
hydraulic breaker |
Group 2 |
Circuit
configuration |
Group 3 |
Maintenance |
Group 4 |
Precaution
while operating the breaker |
Group 5 |
Quick
clamp |
|
|