|   
         
        CRAWLER 
                EXCAVATOR R55-7A | 
| SECTION 
        1 | |||
| GENERAL | |||
| Group 1 | Safety Hints | ||
| Group 2 | Specifications | ||
| SECTION 2 | |||
| STRUCTURE AND FUNCTIONND FUNCTION | |||
| Group 1 | Pump Device | ||
| Group 2 | Main Control Valve | ||
| Group 3 | Swing Device | ||
| Group 4 | Travel Motor | ||
| Group 5 | RCV Lever | ||
| SECTION 3 | |||
| HYDRAULIC SYSTEM | |||
| Group 1 | Hydraulic Circuit | ||
| Group 2 | Main Circuit | ||
| Group 3 | Pilot Circuit | ||
| Group 4 | Single Operation | ||
| Group 5 | Combined Operation | ||
| SECTION 4 | |||
| ELECTRICAL SYSTEM | |||
| Group 1 | Component Location | ||
| Group 2 | Monitoring System | ||
| Group 3 | Electrical Circuit | ||
| Group 4 | Electrical Component Specification | ||
| Group 5 | Connectors | ||
| SECTION 5 | |||
| TROUBLESHOOTING | |||
| Group 1 | Before Troubleshooting | ||
| Group 2 | Hydraulic and Mechanical System | ||
| Group 3 | Electrical System | ||
| SECTION 6 | |||
| MAINTENANCE STANDARD | |||
| Group 1 | Operating Performance Test | ||
| Group 2 | Major Components | ||
| Group 3 | Track and Work Equipment | ||
| SECTION 7 | |||
| DISASSEMBLY AND ASSEMBLY | |||
| Group 1 | Precaution | ||
| Group 2 | Tightening Torque | ||
| Group 3 | Pump Device | ||
| Group 4 | Main Control Valve | ||
| Group 5 | Swing Device | ||
| Group 6 | Travel Device | ||
| Group 7 | RCV Lever | ||
| Group 8 | Turning Joint | ||
| Group 9 | Boom, Arm, Bucket Cylinder | ||
| Group 10 | Undercarriage | ||
| Group 11 | Work Equipment | ||
| SECTION 8 | |||
| 
 | COMPONENT MOUNTING TORQUE | ||
| Group 1 | |||
| Group 2 | |||
| Group 3 | |||
| Group 4 | |||
| Group 5 | |||
| Group 6 | |||
| Group 7 | |||
| APPENDIX | |||
| 
 | 
 | ||
| 
 | |||